LINK
It works with the same crack as 2.3. If you have version 2.3 working - just install the 32-bit version of 2.4 and it'll be ok. I had some stability issues with the 64-bit though.
I'm looking for Pro Panel 2.4; Fluid 2.4; PPE 2.4; Preplanning 2.4. If anyone can share
andyz2005 wrote:propanel won't work with the same key as 2.3
-> i am talking about the stand-alone-version
Yes, the stand-alone Pro Panel v2.4 not run with the v2.3's known emulator. But you can use Pro Panel 2.4 Add-on within Electric P8 2.4 if select Ultimate Licence instead of Professional+.
Luca wrote:LINK
It works with the same crack as 2.3. If you have version 2.3 working - just install the 32-bit version of 2.4 and it'll be ok. I had some stability issues with the 64-bit though.
I'm looking for Pro Panel 2.4; Fluid 2.4; PPE 2.4; Preplanning 2.4. If anyone can share
Hello Luca, I installed the new version of Eplan (2.4).
I have a problem, if I open a test project, everything works.
If I create a new project, the program responds with an (internal error) and freezes.
Do you have any solutions?
Hello djto,
I'm aware of this problem. The only solution that i have found so far is that once you open the new eplan you have to wait for [Error:4521] about a hardware conflict. It usually takes from 20 sec to 1 min for this message to appear. After you close it the Eplan starts working as intended - you can make new project, migrate old and so on.
andyz2005 wrote:propanel won't work with the same key as 2.3
-> i am talking about the stand-alone-version
Yes, the stand-alone Pro Panel v2.4 not run with the v2.3's known emulator. But you can use Pro Panel 2.4 Add-on within Electric P8 2.4 if select Ultimate Licence instead of Professional+.
One more tip: the ultimate licence includes only the normal Pro Panel. If you want the extended functions of Pro Panel Professional you have to choose "Eplan component manufacturer package". It's included there.
Luca wrote:Hello djto,
I'm aware of this problem. The only solution that i have found so far is that once you open the new eplan you have to wait for [Error:4521] about a hardware conflict. It usually takes from 20 sec to 1 min for this message to appear. After you close it the Eplan starts working as intended - you can make new project, migrate old and so on.
Luca wrote:Hello djto,
I'm aware of this problem. The only solution that i have found so far is that once you open the new eplan you have to wait for [Error:4521] about a hardware conflict. It usually takes from 20 sec to 1 min for this message to appear. After you close it the Eplan starts working as intended - you can make new project, migrate old and so on.
Luca wrote:Hello djto,
I'm aware of this problem. The only solution that i have found so far is that once you open the new eplan you have to wait for [Error:4521] about a hardware conflict. It usually takes from 20 sec to 1 min for this message to appear. After you close it the Eplan starts working as intended - you can make new project, migrate old and so on.