Hello! Everybody.
After I replace the new control board (6ES5 513-3LB11), running PLC, but when i operation picture the PLC into stop condition, manual restarted PLC also can't able to start, replacement original use board can the normal operation,but need to again del and transfer the programs. Asks everybody to inform, replaces the new control board what needs to do work, whether needs to use the GRAPH5 software to formatting?Thanks!
[?]: After I replace the new control board 6ES5 513-3LB11.
-
- Posts: 4
- Joined: Sat Jun 02, 2007 5:58 pm
- Location: China
-
- Posts: 3
- Joined: Fri Aug 04, 2006 4:28 pm
- Location: Europe
s5 Graph II
hello,
There are problems with the versions of S5 and graph
programs made in an old version can not be edited in
newer versions
greetings
There are problems with the versions of S5 and graph
programs made in an old version can not be edited in
newer versions
greetings